I wanted to double check that my physical domain controller will not be affected by running a P2V migration on it, we would like to P2V our current domain controller (In production) to put into our test environment, this is so we can simulate a in place upgrade from 2008 to 2012. I would just like to double check that installing VMWare converter and running the P2V migration on the current live domain controller WILL NOT affect our current physical machine.
Can anyone advise?