Dear All,
1. I have two VM which are installed the important OS, I have to relocation to VM for hardware upgraded without downtime the VM .
2. I have another VM are need to relocation from Production to DR, but users must be able to access this VM during the relocation period.
Can you tell me what is the step to do for the task?