In our current environment we strictly use vSS. The plan is to migrate to vDS. By migrate I mean we are going to build out a new cluster, with new hosts and connect those to the vDS. Once we get to the point where we have the new cluster setup and connected to the new vDS what is the best approach for moving VM's. All hosts need to be upgraded to 5.1 so it would be better to vMotion the VM's off to the new hosts connected to the vDS, upgrade the old host, and then connect it to the vDS. My question is can you vMotion from a host connected to a vSS to a host connected to a vDS? Do I have connect at least one of the NICS on the source host to the vDS? If there is another method that makes more sense I am open to that idea. Thanks.
↧